Project planning · Galveston, TX

Plan hurricane shutter installation in Galveston

List the windows and doors to cover, check who can close each system and settle permit and windstorm questions before installation begins.

Tell us about your project

Make one opening-by-opening plan

Walk through the house and list windows, exterior glass doors and existing protection by floor. Mark wide doors, unusual shapes and openings behind decks or railings. Rough counts are enough for an enquiry; leave difficult measurements to the installer.

Plan for raised floors and time away

Mention stairs, decks, railings and narrow side yards so the installer can plan access. Then check your own access to controls and locks. For a second home or rental, name who will prepare the house when you are away and how they will get in.

Permits and windstorm certification are different checks

Ask the City of Galveston Building Division about permits for your address and proposed work. Separately, ask TDI or a windstorm inspector whether the work needs a WPI-8 certificate, which TWIA requires before a property is eligible for its coverage. Settle who handles each inspection before work starts; our windstorm guide explains the routes.

Start with an opening list

Give each window and door a short label, note where it is and anything that affects access. Rough counts are enough for an enquiry; the installer confirms sizes and mounting on site.

Compare quote scope
Diagram of an elevated home on pilings with openings labeled W1 to W3 and a wide patio door D1, beside a sample opening list noting location and access details for a quote
Original diagram by Galveston Hurricane Shutter Installation.

From opening list to installation

  1. Record scope and existing systems

    Identify whole-home or selected openings, approximate counts and any existing shutters to retain.

  2. Confirm everyday use

    Consider door access, emergency exit arrangements and who can operate every system.

  3. Ask about the structure

    Have the installer assess the actual attachment surface, required preparation and product limitations.

  4. Resolve permit and windstorm questions

    Ask the jurisdiction and, where appropriate, a windstorm inspector who will apply, inspect and document the work.

  5. Keep the handover documents

    Retain the model list, operation and care instructions, warranty, paid scope and any issued compliance records.

Official sources for your planning

Reviewed 2026-10-14

Common questions

How do I count openings for a hurricane shutter quote?

Walk around the house floor by floor and list every window and exterior glass door, giving each a short label. Note wide doors, unusual shapes and openings behind decks or railings; the installer measures on site.

Do I need shutters on every window?

Not necessarily, but decide deliberately. Both whole-home and selected-opening projects are possible; ask the installer to list any uncovered openings and explain what leaving them uncovered means for your home.

How long does it take to close shutters on a whole house?

It varies with the system, the number of openings and access. Time a full practice run after installation so the person responsible knows how much notice they need.

Can shutters replace an evacuation plan?

No. Shutters protect openings; they do not make a home safe to stay in during a storm. Follow local evacuation instructions and keep a household evacuation plan.